The ‘freeze’ for pkgsrc-2010Q1 is scheduled to start March 16th, which will be right around the same time of the DragonFly 2.6 release.  The freeze lasts 2 weeks, usually, so new packages for 2.6 will be built probably about mid-April, based on this info…

[[!meta title="pkgsrc-2010Q1 freeze soon"]] [[!meta permalink="http://www.shiningsilence.com/dbsdlog/2010/03/04/5537.html"]] [[!meta author="DragonFly Digest Feed"]] [[!meta authorurl="http://www.shiningsilence.com/dbsdlog/"]]